Our facility is built primarily for compute-heavy workloads such as AI training, HPC, scientific computing and rendering. We also offer colocation for companies that want reliable, well-connected space in the region. If your workload pushes hardware hard, you will feel at home here. If you just need a rack in a well-run facility, we can do that too.
Lumilogic is building a compute-focused data center in Riihimäki, designed from the ground up for demanding AI and HPC workloads. We also support colocation and private cloud. The facility is small enough that you’ll actually talk to the people running it, and large enough to grow with you.
The facility in Riihimäki is purpose-built for compute-heavy workloads. Power, cooling and fire suppression are all designed with redundancy in mind, and fiber connectivity comes in from separate entry points so there is no single point of failure. Tier 2 capacity is coming online first, with Tier 3 following. ISO 27001 certification is in progress.
Your questions answered
With a careful estimate, Phase 1 capacity comes online in 2026. If you have a deployment planned for late 2026 or beyond, now is a good time to have a conversation so we can plan around your timeline.
We are building for high density from the start. Get in touch with your specific requirements and we will tell you straight whether we can support them.
Yes. We have redundant fiber coming in from separate entry points. Additional ISP connectivity and direct IXP connection are on the roadmap.
Yes. We are happy to show you around. Contact us and we will arrange it.